Buyer Enquiry Over $1,595,000
Stage One - Complete and Available Now
Stage one of this exclusive four-home coastal development is now complete, offering an exceptional opportunity to secure a high-quality, architecturally designed home in one of Wellington's most tightly held seaside locations.
This generously proportioned four-bedroom, three-bathroom home with study is ready to move into now and has been finished to an uncompromising standard throughout.
The Home
- Four spacious bedrooms
- Three beautifully appointed bathrooms
- Dedicated study
- Master suite with deck, walk-in wardrobe and ensuite
- Designer kitchen with separate scullery
- Open-plan kitchen, dining, and living
- Separate laundry
- Seamless indoor-outdoor flow to a large deck
- Sweeping coastal views stretching north to south
Every detail has been thoughtfully considered, from the quality of materials to the intelligent layout designed to maximise light, views, and comfort. This is a home that truly must be seen to be appreciated.
Comfort & Performance
- Fully insulated, including all walls
- Thermal-break double glazing throughout
- Two large-capacity heat pumps
- Designed for year-round warmth, efficiency, and comfort
Location
Positioned within the Island Bay Marine Reserve, the lifestyle on offer here is exceptional. From dolphins and penguins to dramatic fish work-ups, the natural environment is ever-changing and endlessly captivating.
Island Bay itself is a vibrant, tightly knit coastal suburb-lively when you want it to be, relaxed when you don't. Enjoy local cafes, coastal walks, and an easy commute into the city.
Key Features at a Glance
- Four bedrooms + study
- Three bathrooms
- Kitchen with scullery
- Large deck with arguably Wellington's best coastal views
- Fully insulated, high-performance build
- Easy access to Wellington CBD
**Stage Two - Coming December 2026**
Indicative Price: BEO $1.2m - $1.3m
Stage two will comprise three additional homes, each offering:
- Three bedrooms
- Two bathrooms
- Large internal garage
Completion is expected December 2026.
Plans and Resource Consent documentation are available upon request.